tub to shower and closet

Before

Updates include

  • Removed leaking existing shower
  • Moved wall for symmetry which enlarged closet
  • Ductwork move and added HVAC to room
  • Tub to shower conversion 25 year manufacturer warranty
  • Custom quartz niche and bench
  • Large format subway tile with limestone floor
  • Linear tile-in drain
  • Lighting repositioned to mirrors
  • Oak flooring continued throughout bath
  • R n R Toto toilet
  • New hardware